Sunday, June 30, 2013

Shadowbend Pool and Park Renovations

Shadowbend Pool and Park is one of the oldest in The Woodlands- 25 years old. At the Board’s June 20th meeting, our park design consultant, White Oak Studio, provided an overview of the conceptual design plans for refurbishing this park and its pool. Before taking any action, the further Board requested input from the Cochran’s Crossing Village Association.

Prior to these meetings, an online survey obtained input from almost 400 residents. The resident feedback was:

·         Well maintained, safe and secure facilities are the most important needs (99%).

·         Almost all residents want a wide variety of facilities available (91%) with play facilities (85%).

·         Most people want the park to offer opportunities for interaction with nature (82%) and to look and feel open (79%) and welcoming (75%).

·         Slightly fewer find it important to have peace and quiet (68%) and to have lots of activity available (65%).

·         Improvements that were most preferred included:

·         Repair the pool building (the building is a synthetic stucco façade with a great deal of water and structural wood damage)

·         Add water play features such as spray play to the pool

·         Add shade to the pool area

·         Upgrade the restrooms

·         Add path lighting

·         Upgrade / expand playgrounds
One of the big surprises regarding the Shadowbend pool facilities, in comparison to the new Sawmill Pool for example, was the very poor condition of the building and the need to bring the pool and its equipment up to current Health and Building Codes. This work is estimated to cost about $427,000 before we could even think about other improvements to the pool or the park itself. Additional costs were estimated at $523,000 to upgrade the pool amenities to be on par with what our newer parks have today and another $435,000 for improvements to the park itself. 

The Board considered all of these factors and resident input in deciding on the scope of the project at its June 26th meeting. The Board, including myself, approved (with one Director opposing) a preliminary budget of $1,385,500.  The one opposing Director wanted to hold the cost at $1 million but had no suggestions as to what reductions in scope should be made to achieve this lower budget. I thought the lower budget was unreasonable given we will need to spend almost half of this $1 million to bring the pool up to code before any improvements could even be made. I do believe we need to watch any “scope creep” and hold the budget to what we have approved. 

During the meeting, a lot of the discussion revolved around this very large budget amount in comparison to an initial budget of $500,000.  When Sawmill Park was recently redone, the cost of that pool was about $980,000. It also had a placeholder budget of $500,000.  If one subtracts the significant Shadowbend pool building and equipment repair costs of $427,000 from its budget, the two projects appear to be very comparable, around $1 million. The Board will have an opportunity to revisit this matter as the project goes through the design and bid process. The future checkpoints are:

·         November 2013- Board reviews/approves Shadowbend Park Renovation Bids

·         January 2014- Renovation Starts

·         May 10, 2014 (or earlier)- Renovation Complete
The longer term issue is that using a $500,000 budget placeholder for these sorts of improvements is not realistic and we need to get “real.” We need to reconsider what we need to set aside over the next 20 years to refurbish our major parks and the other 12 pools when their time comes. This will be a major consideration during our July budget meetings—what is needed in our capital project sinking fund to pay for the $170 million in assets and amenities we will need to replace or refurbish over the next 20 years?

Friday, June 28, 2013

The Future of the Woodlands Express Park & Ride

As a member of The Woodlands Township Ad Hoc Transportation Committee, I would like to try to clear the air regarding recent articles and letters regarding the possible purchase by the Township of new buses for the Woodlands Express Park and Ride.  First, let me say that the Board has not made a firm decision to do anything other than to continue to evaluate our options. But it is clear that change is needed. 


I am sure many of you have read about the new Conroe-Woodlands Urbanized Area (UZA). This new area was created by the Federal Transit Authority (FTA) due to our increased population of 240,000. This decision moved our area from a rural designation to an urban area where the Township now directly receives FTA funds in support of our transit programs. The new urban area includes portions or all of The Township, the Cities of Conroe, Cut and Shoot, Oak Ridge North, Panorama Village, Shenandoah, Woodloch, and some unincorporated portions of South County. As of October 1, 2012, The Township Board and the City of Conroe were approved by the FTA as the dual designated recipients charged with managing the FTA funds allocated to the UZA. This decision resulted in the transfer of responsibility for the Woodlands Express Park and Ride from the Brazos Transit District to The Township. Brazos now serves as a contractor to The Township. 

In considering how to adapt to the change to the new UZA, The Township could have elected to bow out of taking on any UZA role. In such a scenario, the City of Conroe would have become responsible for how FTA transit dollars are allocated within our area.  But would such a decision be in the best interest of our residents? Would such a decision have put us at risk of simply becoming a “stopover” to a new Conroe Park and Ride?  

In making the decision to share in the management of the new UZA, the Board elected to retain control over our own destiny and make sure we looked after the transit interest of our residents. However, in fulfilling our new UZA role, a stipulation of the FTA funding is that the park and ride service meet the needs of the broader South County community and not just our ridership. Today, only 60% of the riders live within The Township. If The Township taxpayers were funding any part of the service, this would be inequitable and a problem. However, since the park and ride has been completely self funding through ridership fees and FTA funding, this has never been an issue. The Township’s objective is to make sure “who pays” never becomes an issue by insuring the park and ride continues to fund itself with no local taxpayer subsidies.
 
The Woodlands Express has existed for over 25 years. It is a very important service to approximately 1,700 people who ride the 33 buses out of three locations. The facilities were all built by the Brazos Transit District with federal dollars on land donated by the Woodlands Development Company. In May 2013, 31,889 round trips (39 routes) were made to Downtown Houston, the Medical Center and Greenway Plaza.  This is a significant growth over the 9 buses providing 12 round trips out of the Sawdust location in 1987. The Woodlands Express is an important attractor to residents who wish to live in the Woodlands but work in Houston.  

The benefits of the Woodlands Express Park & Ride are:

· Reduces congestion (Imagine an 1,600 cars on I-45 each day)

· Reduces emissions (59 tons/day reduction 1)

· Saves Gas (6,080 gallons/day 1)

· Saves Money (wear/tear on Car, $9.02 trip or $18.04/day 1)

· Saves money on parking

· Less stress

· More convenient

· Provides a selling feature to attract S. Montgomery County residents to remain or locate in our community.

For the first 6 months of 2013, one current rider provided the following interesting information 1 :

· Bus Trips Made: 279

· Miles not put on their car: 11, 382.6 miles

· Gas not purchased: 517.4 gallons

· Their savings to date for 2013: $2,511.88

· Total Emission Reductions: 5.1 Tons (Nitrogen Oxides: 31.24 lbs, Volatile Organic Compounds: 11.43 lbs and Carbon Dioxide: 10,140.9 lbs)

(1 Source: NuRide: www.nuride.com)

The above information continues to reinforce the fact that, since its inception, the Woodlands Express has been one of the most successful operations in the nation. The Woodlands Township recent ridership survey shows that 93% of the riders believe they receive value from using the park and ride.  

Until 2010, approximately 85% of the cost of the park and ride was funded from ridership fees, with the remainder coming from federal subsidies. It has required no local subsidies. But this favorable financial picture began to change with the bankruptcy of the old bus operator. The cost of the replacement bus operator has now increased by 40% -- $126 to $176 per service hour. This rate includes the bus operator providing all the buses needed. This “turnkey” approach is the most expensive option for providing the service. It also limits the number of bus operators qualified to bid on the service.  In addition, the current fleet is now 10-12 years old resulting in increased complaints regarding the quality of the park and ride experience. In order to provide newer 2011/12 buses, Brazos has begun to use a new bus operator at the Sterling Ridge location. But the cost of this change has further increased the cost to $208/ hour- a 67% increase over the cost of the old bus operator in 2010.  

Under the current turnkey bus operator approach, this increased cost can no longer be absorbed solely through ridership fees and the FTA subsidies. There is a limit to what the FTA will fund.  The Township has developed 10 year financial projections covering several scenarios, including the status quo. The option of staying with the status quo is not a pretty one- it is estimated that if no change is made we will start to incur a funding deficit in 2019. This will be a deficit that local taxpayers will have to fund. We have time to reverse this picture. The Township needs to take a different approach. It is critical that we preserve our park and ride service but do so in a way that puts it back on the path of being a self funding operation. We must avoid any funding deficits and associated local taxpayer liabilities in the future.  Based on our understanding that federal monies will be available to cover 50% of the cost of the new buses, the bus purchase scenario appears to be the most attractive option to achieving these objectives. Ownership of our buses will reduce the rising operating cost per service hour back to $126. This 40% cost reduction totally cover the cost to issue and repay the $10 million in bonds required to purchase the new buses. If we own our buses we will also have more options as to who we use to operate the buses. 

We still have more work to do before the Board is ready to make a firm decision. The bottom line is that under the bus purchase scenario approach it appears the Woodlands Express Park and Ride can be returned to a high quality, self sufficient position at no additional cost to our taxpayers now or in the future.  I believe this should be our goal.

November 11, 2013 update

Since I posted the above, we have developed  a better understanding of the bus purchase option. In my opinion, this option is not proving to be very risky and will not reduce the operating cost as much as we once thought- not onloy a 20% cost reduction is expected versus the orginal 40% reduction we wer told. With the recent fare increase, The Woodlands Express is now completly funding itself through the ridership fees and FTA grants. Thus, I do not think the potential operating cost  savings are not sufficently large enough to justify the risk of taking on a $10-11 million debt that the system would have to repay.

Mike Bass

The Woodlands Township, Director (Position 2)

Ad Hoc Transportation Committee


713-299-1184